Power upgrades at campus buildings
|
Oncor is upgrading electrical lines at UTA starting Friday, Aug. 1, at 7 p.m. until Sunday, Aug. 3, at 7 p.m. During the scheduled power transfer, the following buildings may experience a brief interruption in electrical service. Once these upgrades are complete, Oncor will be able to provide more stable power in the future.
|
|
|
- CAPPA (mail building only)
- College of Business
- College Hall
- Fine Arts building
- NanoFab
- Woolf Hall
|
|
- Arlington Hall
- Chemistry & Physics building
- Engineering Lab building
- Earth and Environmental Sciences
- Nedderman Hall
|
|
|
The Science and Engineering Innovation and Research building and the School of Social Work/Smart Hospital building will operate on generators during the upgrade.
|
Server update at UTA's Police Department
|
UTA's Police Department is getting a critical server update on Sunday, Aug. 3, from 8 a.m. to 5 p.m. During this time several systems including the police dispatch system, will be offline. A MavAlert with contact information for the Police Department during the update will be sent when the system goes offline and when the system is restored.
|
|
|
The University of Texas at Arlington
701 S. Nedderman Drive | Arlington, TX 76019 US
|
|
|
|