CLOSING IN ON MECHANICAL COMPLETION: ARIES LINDEN BIOSOLIDS GASIFICATION PLANT UPDATE
On the first floor, final preparations are underway on the mechanical control boxes (photo on left). On the second
floor, the completion of the silver, D-shaped hot AIR Duct is seen on one of the dryers. The pug mill (grey box) is where wet biosolids are mixed with recycled Class A biosolids before going to the dryers. After being dried to the desired moisture content, the Class A biosolids are sent to the gasifier for conversion.